A roofing crew tearing off old shingles on a brick house

For roofing contractors

Know what every roof made.

Jobmetry schedules your crews, sends each roofer their day, checks tomorrow's roofs the night before, and puts the real labor and material cost against the contract. Built in squares, tear-off and dry-in, not translated from another trade.

One roof, start to finish

A 28-square rip and replace that still made 27%.

Whitaker Residence, from the Ridgeline Roofing demo company. Shingles, underlayment and ice & water. The town permit. The dumpster for tear-off debris. Decking sheets that weren't in the quote. 47 hours against 44 estimated. Every line is an invoice or a receipt someone photographed, and the job still made 27%.

That's the kind of answer you get on every finished roof.

Money tab of a roofing rip and replace: contract, labor, expenses and 27% profit
Demo data · Ridgeline Roofing

Set up for roofing

Your job types and your words.

Job types

Inspection to full tear-off

Inspections, repairs, overlays and rip and replace, each with the fields that matter for it.

Job fields

Squares first

Squares, roof system, existing layers, decking condition, underlayment, ventilation, insurance claim and claim number, reported leak location.

Site fields

Remembered for next time

Pitch, difficulty, stories, roof height, access, ladder location and dumpster placement stay with the address.

Before you finish

Fifteen items, written for a roof.

Landscaping protected. Tear-off complete. Decking inspected and photographed. Roof dried in before leaving. Underlayment and ice & water, drip edge, valleys and flashing, ridge and ventilation, pipe boots sealed. Gutters cleared, dumpster scheduled, homeowner walkthrough.

The ones marked photo won't tick without a photo. Mark visit complete is what releases the job to close-out and costing.

More on the crew app →

Roofing finish-up checklist with photo-required items
Demo data · Ridgeline Roofing

A cost from the roof

The second dumpster pull, before it disappears.

  • The crew reports the $265 extra dumpster pull from their phone, with a photo of the receipt.
  • It shows on the job as not counted yet until you approve it. Approve it and it lands in the job's cost the same second.
  • Reject it and the record and the note stay. A receipt that silently vanishes is how crews stop reporting anything.
  • Until the roof is finished there's no profit figure at all, on purpose. Revenue is booked on day one; cost arrives over weeks.
Pending crew-reported dumpster cost awaiting approval on a roofing job
Demo data · Ridgeline Roofing

Labor hours per square

The number you already estimate in your head.

Metrics track labor hours per square on every finished roof and compare it with what you estimated. A job type that keeps running over is priced wrong, not worked slowly. Averages stay greyed out until five roofs are finished, so you aren't steering by two data points.

Metrics screen with revenue, margin, revenue per hour and labor hours per square by job
Demo data · Ridgeline Roofing

The night before

Don't find out in the driveway.

The Tomorrow screen scores every roof on the schedule for tomorrow, worst first: an inspection with nobody assigned, an overlay where the homeowner didn't answer and the crew leader raised a conflict. Rain is in the forecast line, but not in the score. You can't fix weather.

In the roofing demo: Ridgeline Roofing, a demo company with five months of inspections, repairs, overlays and full rip and replace. You'll see squares and tear-off, not panels. About 15 minutes.

See a roofing company's week in 15 minutes.

We walk you through a demo company with five months of finished jobs, and answer your questions on the way. Bring your own numbers if you like. No slides, no pressure.