Inspection to full tear-off
Inspections, repairs, overlays and rip and replace, each with the fields that matter for it.

For roofing contractors
Jobmetry schedules your crews, sends each roofer their day, checks tomorrow's roofs the night before, and puts the real labor and material cost against the contract. Built in squares, tear-off and dry-in, not translated from another trade.
One roof, start to finish
Whitaker Residence, from the Ridgeline Roofing demo company. Shingles, underlayment and ice & water. The town permit. The dumpster for tear-off debris. Decking sheets that weren't in the quote. 47 hours against 44 estimated. Every line is an invoice or a receipt someone photographed, and the job still made 27%.
That's the kind of answer you get on every finished roof.

Set up for roofing
Inspections, repairs, overlays and rip and replace, each with the fields that matter for it.
Squares, roof system, existing layers, decking condition, underlayment, ventilation, insurance claim and claim number, reported leak location.
Pitch, difficulty, stories, roof height, access, ladder location and dumpster placement stay with the address.
Before you finish
Landscaping protected. Tear-off complete. Decking inspected and photographed. Roof dried in before leaving. Underlayment and ice & water, drip edge, valleys and flashing, ridge and ventilation, pipe boots sealed. Gutters cleared, dumpster scheduled, homeowner walkthrough.
The ones marked photo won't tick without a photo. Mark visit complete is what releases the job to close-out and costing.

A cost from the roof

Labor hours per square
Metrics track labor hours per square on every finished roof and compare it with what you estimated. A job type that keeps running over is priced wrong, not worked slowly. Averages stay greyed out until five roofs are finished, so you aren't steering by two data points.

The night before
The Tomorrow screen scores every roof on the schedule for tomorrow, worst first: an inspection with nobody assigned, an overlay where the homeowner didn't answer and the crew leader raised a conflict. Rain is in the forecast line, but not in the score. You can't fix weather.
In the roofing demo: Ridgeline Roofing, a demo company with five months of inspections, repairs, overlays and full rip and replace. You'll see squares and tear-off, not panels. About 15 minutes.
We walk you through a demo company with five months of finished jobs, and answer your questions on the way. Bring your own numbers if you like. No slides, no pressure.