A solar installer carrying a panel across a tiled residential roof

For solar installers

Run your installs. Know what each one made.

Jobmetry schedules your crews across installs, removals, reinstalls and service calls, checks that tomorrow is ready, and shows the profit on every finished job. It's in daily use at a Connecticut solar installer.

Set up for solar

Your job types, your fields, your checklists.

Nothing to configure on day one. The solar setup comes with the work you already do.

Job types

From new installs to batteries

New installation, removal, reinstallation, removal + reinstall (set up as two visits), service call, troubleshooting, inspection correction, system expansion, panel, inverter and battery work, roof assessment.

System & site

The details crews ask about

Panel count, make and wattage, inverter, micros or optimizers, battery, utility. Roof material, pitch, difficulty, stories, mount type, racking, ladder spot and panel location stay with the site for next time.

Checklists

Readiness, safety, finish-up

Permit and interconnection approved, equipment received and staged. Fall protection and electrical isolation. Before, layout, wiring and finished-array photos on removals and reinstalls.

The night before

An empty house costs a full crew-day.

The Tomorrow screen scores every visit for the next day and puts the worst first: nobody assigned, homeowner not called or not answering, a crew member who raised a conflict, missing instructions. You fix it tonight instead of finding out at 7 a.m. in someone's driveway.

The forecast is shown too, and deliberately left out of the score.

Tomorrow readiness screen for a solar company with visits scored worst first
Demo data · Brightpath Contracting

The money

Hours per panel, by job type.

  • Each finished job shows contract, labor at burdened rates, approved expenses and profit.
  • Metrics track labor hours per panel, so you can compare new installs with removals and reinstalls and quote the next one better.
  • Estimate against actual shows which job types run over.
  • Your crews never see a dollar figure.

More on job costing →

Job profit and loss ledger for finished solar jobs with contract, labor, expenses, profit and margin
Demo data · Brightpath Contracting

Also a sub?

Install for dealers too?

If some of your work comes from dealers or sales companies, partner booking links let them see your open days and request installs, which you approve.

For solar subcontractors →

In the demo: Brightpath Contracting, a demo solar company with about 52 jobs over five months. We walk through tomorrow's three visits, a job end to end, the costing ledger and a crew member's phone. About 15 minutes.

See a solar company's week in 15 minutes.

We walk you through a demo company with five months of finished jobs, and answer your questions on the way. Bring your own numbers if you like. No slides, no pressure.